Swiss startup Sun-ways is planning to build a 18 kW pilot PV system between the racks of a 100-m linear section of a railway line in the Swiss canton of Neuchâtel.
You drop heavy ass tarps on the roof and roll them to tent a house, I’m taking couple hundred pound tarps. The workers need to be able to walk on the roof to set them up, the tarps can and have damaged panels so companies in the area don’t fumigate with them on anymore.
I work closely with a fumigation company and that’s what they’ve told us.
Why did they have to remove the panels in order to fumigate? If the company couldn’t work around them then they should have found a different company.
You drop heavy ass tarps on the roof and roll them to tent a house, I’m taking couple hundred pound tarps. The workers need to be able to walk on the roof to set them up, the tarps can and have damaged panels so companies in the area don’t fumigate with them on anymore.
I work closely with a fumigation company and that’s what they’ve told us.