First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • cryball@sopuli.xyz
    link
    fedilink
    English
    arrow-up
    2
    ·
    edit-2
    1 year ago

    My personal dream scenario is one, where renewables and nuclear become such cheap production methods, that electricity is cheap and abundant.

    At that point one could just use that energy to synthesize fuel to avoid the hassle that is hydrogen storage.

      • cryball@sopuli.xyz
        link
        fedilink
        English
        arrow-up
        2
        ·
        1 year ago

        Thats the point of having energy abundance. When electricity costs are low enough, it wouldn’t matter, if the source of synthetic fuel was not the most energy efficient one.